- Notice
- This is a top secret board, authorized personnel only!
- Error
- This is a top secret board, authorized personnel only!
| WPC precautions during the installation process | |
|---|---|
| Tweet Topic Started: Aug 25 2015, 04:21 AM (2 Views) | |
| wei2xian | Aug 25 2015, 04:21 AM Post #1 |
|
<p>The main purpose is to replace the difference between wood timber, wood and pine, poplar, eucalyptus and other natural wood is that it is a kind of plastic and wood fiber synthetic "wood"; the current production of wood-plastic composite products of wood Most of the fiber content is greater than 50%, wood-based, home and abroad, this material also played some aliases, such as severe tension "waterproof wood", "eco-wood" and so on, global timber resources for wood floor to provide a broad space for development. "Some say the following precautions during installation WPC should do. plastic wood flooring for indoor bathrooms</p> <p>First, on the WPC cutting and drilling, we recommend using alloy saw and drill tips: dilute tooth blade (such as diameter 45 cm, 18-24 tooth) cutting easier. 1, WPC is easy to use, unlike wood, when you do not have to consider the use of WPC wood grain direction or nodes. 2. When drilling large or deep holes, withdraw the drill bit to be timed to bring out the debris, you do not always want to disposable drilled. 2. Second, with regard to the installation of wood materials, under normal circumstances, when WPC joists span of 30-50 cm (depending on the profile size). price waterproof wooden panels for exterior walls</p> <p> 1, self tapping screws durability, is the preferred installation WPC profiles. 2, the use of special screws during installation, you must advance drilling. Pre-drilling diameter should be less than 3/4 straight nail or screw diameter. 3, when the profile is wider than 10mm, each end should be two screws. In particular, use of the environment or abnormal load conditions - such as a hot bath - may require a shorter distance during installation. Third, on the gap WPC taken into account when installing drainage, cleaning and minor thermal expansion, contraction and other reasons, installation profiles, edge to edge, you must leave appropriate gap between the head of the head. Edge to Edge: WPC side to side between the requirements of ≥4 mm: When installed in a cold climate, ≥4 mm clearance requirements. diy wooden fence singapore</p> |
![]() |
|
| 1 user reading this topic (1 Guest and 0 Anonymous) | |
| « Previous Topic · Rebound 2 · Next Topic » |
| Theme: Rebound 2 | Track Topic · E-mail Topic |
8:43 AM Jul 11
|




8:43 AM Jul 11