| Great floor maintenance; wpc deck | |
|---|---|
| Tweet Topic Started: Sep 30 2016, 05:56 AM (6 Views) | |
| qzz10011 | Sep 30 2016, 05:56 AM Post #1 |
|
<h3>Maintenance of milling machine</h3> <p>1、Road milling machine maintenance procedures, safety should take attention ,also work, and arson, etc., and protective equipment is necessary to wear during the maintenance process.</p> <p>2、Without making special note, maintenance work should be done under the condition of the engine stopped running. </p> <p> 3、Before starting maintenance, make sure the road milling machine will not be inadvertently activated, rotate or fall. </p> <p>4、When cleaning the road milling body, not using flammable materials.</p> <p> 5、When using high-pressure cleaners or steam spray device, it should be covered when water jet power components, insulation, ventilation equipment if necessary.</p> <p>6、Several welding work must be note the following</p> <p>(1)Turn off the power. </p> <p>(2)Interrupts the power supply line </p> <p>(3) Find adjustment of the measuring device (plug 2 × 2), the central control computer and the drive control using the power switch (2 × 1 plug) on your computer. And a switch (1 Double plug) 6 slave and engine control device with electrical power on the power supply should be disconnected.</p> <p>4)Welder ground should be as far away from the solder joint.</p> <p>7、 Change running diesel engine oil after 250 hours after the first time trial operation, replace after every 500 hours . 8, during the first oil filter 250 hours during a test run after the replacement, after no interval 500 hours to replace.</p> <p>8、Change the oil filter after250 hours,replace every 500 hours.</p> <p>9、Add a little lubrication for new fuel filter seal,full fill the fuel oil to filter before installing, for tightening.</p> <p>10、Air filter every 50 hours to empty the dust collector, then the team with compressed air filter clean sweep.</p> <p>11、Coolant filter need to be changed replaced every 1000 hours or one time every year.</p> <p>Related Sites:<br /> compactor asphalt pavement works<br /> asphalt road potting machine works<br /> Best Plasma System Machinery<br /> Italy Best Command Display System </p> |
| wholesale composite deck boards - buy from china | |
![]() |
|
| 1 user reading this topic (1 Guest and 0 Anonymous) | |
| « Previous Topic · [#1] Experiment · Next Topic » |





6:58 PM Jul 11